Vista Bluff Wind I "Alternate POI" (28INR0446)

Vista Bluff Wind I "Alternate POI" is a 290.4 MW other interconnection project in Upton, Texas with a current status of operational. It is proposed to connect at tap 345 kV (76000) North McCamey - (59903) Bearkat (Benedum 345 kV station that LCRA will build part of 24RPG024)..

290.4 MWCapacity
OperationalStatus
UptonMarket
OtherTechnology

Project facts

Canonical nameVista Bluff Wind I "Alternate POI"
Queue ID28INR0446
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketUpton
TechnologyOther
Capacity290.4 MW
StateTexas
CountyUpton
Point of interconnectiontap 345 kV (76000) North McCamey - (59903) Bearkat (Benedum 345 kV station that LCRA will build part of 24RPG024).
Requested (queue) date2025-09-22
Proposed in-service date
Operational date2029-12-31
Withdrawn date
DeveloperVista Bluff Windpower, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.