Vista Bluff Wind I "Alternate POI" (28INR0446)
Vista Bluff Wind I "Alternate POI" is a 290.4 MW other interconnection project in Upton, Texas with a current status of operational. It is proposed to connect at tap 345 kV (76000) North McCamey - (59903) Bearkat (Benedum 345 kV station that LCRA will build part of 24RPG024)..
Project facts
| Canonical name | Vista Bluff Wind I "Alternate POI" |
|---|---|
| Queue ID | 28INR0446 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Upton |
| Technology | Other |
| Capacity | 290.4 MW |
| State | Texas |
| County | Upton |
| Point of interconnection | tap 345 kV (76000) North McCamey - (59903) Bearkat (Benedum 345 kV station that LCRA will build part of 24RPG024). |
| Requested (queue) date | 2025-09-22 |
| Proposed in-service date | — |
| Operational date | 2029-12-31 |
| Withdrawn date | — |
| Developer | Vista Bluff Windpower, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.