W A Parish (3470_GT1)

W A Parish is a 16.3 MW gas interconnection project in Fort Bend, Texas with a current status of operational.

16.3 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameW A Parish
Queue ID3470_GT1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity16.3 MW
StateTexas
CountyFort Bend
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1967-07-01
Withdrawn date
Developer
Utility / transmission ownerNRG Texas Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata