WA Queue Project 133 — Solar+Battery in Garfield County, Washington

WA Queue Project 133 — Solar+Battery in Garfield County, Washington is a 300.0 MW solar+battery interconnection project in Garfield County, Washington with a current status of withdrawn. It is proposed to connect at Dodge Junction 230kV Substation.

300.0 MWCapacity
WithdrawnStatus
WAMarket
Solar+BatteryTechnology

Project facts

Canonical nameWA Queue Project 133 — Solar+Battery in Garfield County, Washington
Queue ID133
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar+Battery
Capacity300.0 MW
StateWashington
CountyGarfield County
Point of interconnectionDodge Junction 230kV Substation
Requested (queue) date2022-05-19
Proposed in-service date2025-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata