Garfield County County, Washington — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Garfield County, Washington, representing 778 MW of requested capacity.
4Total projects
0Active
0Operational
4Withdrawn
778 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 478 MW |
| Solar+Battery | 1 | 300 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| WA Queue Project 133 — Solar+Battery in Garfield County, Washington | 133 | Solar+Battery | 300.0 MW | withdrawn | Garfield County, Washington |
| WA Queue Project 131 — Wind in Garfield County, Washington | 131 | Wind | 197.8 MW | withdrawn | Garfield County, Washington |
| WA Queue Project 126 — Wind in Garfield County, Washington | 126 | Wind | 140.0 MW | withdrawn | Garfield County, Washington |
| WA Queue Project 130 — Wind in Garfield County, Washington | 130 | Wind | 140.0 MW | withdrawn | Garfield County, Washington |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Garfield County County.
Start tracking with interXdata