WA Queue Project G0832 — Battery in Snohomish, Washington

WA Queue Project G0832 — Battery in Snohomish, Washington is a 25.0 MW battery interconnection project in Snohomish, Washington with a current status of active. It is proposed to connect at Murray: Snohomish Co PUD 115 kV Feeder 1.

25.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G0832 — Battery in Snohomish, Washington
Queue IDG0832
Statusactive
Source statusSTUDY
MarketWA
TechnologyBattery
Capacity25.0 MW
StateWashington
CountySnohomish
Point of interconnectionMurray: Snohomish Co PUD 115 kV Feeder 1
Requested (queue) date2022-12-22
Proposed in-service date2025-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata