WA Queue Project G0921 — Wind in Thurston, Washington
WA Queue Project G0921 — Wind in Thurston, Washington is a 300.0 MW wind interconnection project in Thurston, Washington with a current status of withdrawn. It is proposed to connect at Chehalis - Covington No 1 230kV line..
300.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology
Project facts
| Canonical name | WA Queue Project G0921 — Wind in Thurston, Washington |
|---|---|
| Queue ID | G0921 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | WA |
| Technology | Wind |
| Capacity | 300.0 MW |
| State | Washington |
| County | Thurston |
| Point of interconnection | Chehalis - Covington No 1 230kV line. |
| Requested (queue) date | 2023-09-01 |
| Proposed in-service date | 2030-10-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.