WA Queue Project G1091 — Solar in Snohomish, Washington

WA Queue Project G1091 — Solar in Snohomish, Washington is a 1.0 MW solar interconnection project in Snohomish, Washington with a current status of active. It is proposed to connect at Quil Ceda Substation sits between BPA Murray and BPA Snohomish.

1.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1091 — Solar in Snohomish, Washington
Queue IDG1091
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity1.0 MW
StateWashington
CountySnohomish
Point of interconnectionQuil Ceda Substation sits between BPA Murray and BPA Snohomish
Requested (queue) date2026-01-26
Proposed in-service date2026-04-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata