Wake Wind Energy Repower (26INR0647)

Wake Wind Energy Repower is a 252.5 MW other interconnection project in Crosby, Texas with a current status of operational. It is proposed to connect at 59904 Cottonwood 345.

252.5 MWCapacity
OperationalStatus
CrosbyMarket
OtherTechnology

Project facts

Canonical nameWake Wind Energy Repower
Queue ID26INR0647
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCrosby
TechnologyOther
Capacity252.5 MW
StateTexas
CountyCrosby
Point of interconnection59904 Cottonwood 345
Requested (queue) date2025-04-21
Proposed in-service date—
Operational date2027-05-10
Withdrawn date—
DeveloperWAKE WIND ENERGY
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30phaseSS Completed, FIS Started, No IASS Completed, FIS Completed, IAlow
2026-09-30ia_signed_date—2014-02-28medium
2026-09-30operational_date2027-05-012027-05-10medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata