Walleye Solar (20INR0127)

Walleye Solar is a 215.2 MW solar interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at 138kV Walleye Creek Switch 3712.

215.2 MWCapacity
OperationalStatus
MilamMarket
SolarTechnology

Project facts

Canonical nameWalleye Solar
Queue ID20INR0127
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMilam
TechnologySolar
Capacity215.2 MW
StateTexas
CountyMilam
Point of interconnection138kV Walleye Creek Switch 3712
Requested (queue) date2018-07-03
Proposed in-service date
Operational date2028-10-01
Withdrawn date
DeveloperSandow Lakes Ranch Solar II, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata