Wallingford GT Uprate is a 350.0 MW gas interconnection project in New Haven, Connecticut with a current status of operational. It is proposed to connect at WED 115kV Lines 1305 and 1406.

350.0 MWCapacity
OperationalStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameWallingford GT Uprate
Queue ID759
Statusoperational
Source statusC
MarketSWCT
TechnologyGas
Capacity350.0 MW
StateConnecticut
CountyNew Haven
Point of interconnectionWED 115kV Lines 1305 and 1406
Requested (queue) date2018-04-26
Proposed in-service date
Operational date2022-05-31
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.