Walton 230 (S1102)

Walton 230 is a 200.0 MW battery interconnection project in Cass, Indiana with a current status of operational. It is proposed to connect at Walton 230.

200.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameWalton 230
Queue IDS1102
Statusoperational
Source statusPending Transfer
Market
TechnologyBattery
Capacity200.0 MW
StateIndiana
CountyCass
Point of interconnectionWalton 230
Requested (queue) date2025-06-16
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.