Wander Waters BESS (27INR0207)

Wander Waters BESS is a 303.5 MW other interconnection project in Wilbarger, Texas with a current status of operational. It is proposed to connect at 61001 JIMTREEC7A 345kV.

303.5 MWCapacity
OperationalStatus
WilbargerMarket
OtherTechnology

Project facts

Canonical nameWander Waters BESS
Queue ID27INR0207
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketWilbarger
TechnologyOther
Capacity303.5 MW
StateTexas
CountyWilbarger
Point of interconnection61001 JIMTREEC7A 345kV
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2027-10-31
Withdrawn date
DeveloperWander Waters BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata