WAPA 230kV Jamestown Substation (GEN-2021-024)
WAPA 230kV Jamestown Substation is a 203.0 MW wind interconnection project in LaMoure, North Dakota with a current status of withdrawn. It is proposed to connect at WAPA 230kV Jamestown Substation.
203.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology
Project facts
| Canonical name | WAPA 230kV Jamestown Substation |
|---|---|
| Queue ID | GEN-2021-024 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | ND |
| Technology | Wind |
| Capacity | 203.0 MW |
| State | North Dakota |
| County | LaMoure |
| Point of interconnection | WAPA 230kV Jamestown Substation |
| Requested (queue) date | 2021-05-14 |
| Proposed in-service date | 2026-12-22 |
| Operational date | — |
| Withdrawn date | 2024-09-16 |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata