WAPA 230kV Jamestown Substation (GEN-2021-024)

WAPA 230kV Jamestown Substation is a 203.0 MW wind interconnection project in LaMoure, North Dakota with a current status of withdrawn. It is proposed to connect at WAPA 230kV Jamestown Substation.

203.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameWAPA 230kV Jamestown Substation
Queue IDGEN-2021-024
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity203.0 MW
StateNorth Dakota
CountyLaMoure
Point of interconnectionWAPA 230kV Jamestown Substation
Requested (queue) date2021-05-14
Proposed in-service date2026-12-22
Operational date
Withdrawn date2024-09-16
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata