Ware Substation - NG WMA Group 3 (1188)

Ware Substation - NG WMA Group 3 is a 11.0 MW solar+battery interconnection project in Hampshire, Massachusetts with a current status of withdrawn. It is proposed to connect at NG Ware Substation.

11.0 MWCapacity
WithdrawnStatus
WMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameWare Substation - NG WMA Group 3
Queue ID1188
Statuswithdrawn
Source statusW
MarketWMA
TechnologySolar+Battery
Capacity11.0 MW
StateMassachusetts
CountyHampshire
Point of interconnectionNG Ware Substation
Requested (queue) date2021-10-27
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata