Warrior Storage (C24-275)

Warrior Storage is a 100.0 MW battery interconnection project in Erie, New York with a current status of withdrawn. It is proposed to connect at Gardenville to Arcade 115 kV Line 151.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameWarrior Storage
Queue IDC24-275
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyErie
Point of interconnectionGardenville to Arcade 115 kV Line 151
Requested (queue) date2024-09-24
Proposed in-service date
Operational date
Withdrawn date
DeveloperSpringville BESS, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata