WARRIORS SOLAR (1392)

WARRIORS SOLAR is a 40.0 MW solar interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Crescent Switching Station 70kV.

40.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWARRIORS SOLAR
Queue ID1392
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity40.0 MW
StateCalifornia
CountyFresno
Point of interconnectionCrescent Switching Station 70kV
Requested (queue) date2017-05-01
Proposed in-service date
Operational date
Withdrawn date2020-05-15
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.