Washington County Solar (GI-197)

Washington County Solar is a 203.0 MW solar+battery interconnection project in Washington County, Georgia with a current status of active. It is proposed to connect at Tiger Creek 230 kV Substation.

203.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical nameWashington County Solar
Queue IDGI-197
Statusactive
Source statusSystem Impact Study
MarketGA
TechnologySolar+Battery
Capacity203.0 MW
StateGeorgia
CountyWashington County
Point of interconnectionTiger Creek 230 kV Substation
Requested (queue) date2024-10-01
Proposed in-service date2026-07-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata