Water Valley Wind Energy (20INR0247)
Water Valley Wind Energy is a 180.0 MW other interconnection project in Tom Green, Texas with a current status of operational. It is proposed to connect at 345 kV 76009 Twin Buttes to 76090 Divide Double Circuit .
180.0 MWCapacity
OperationalStatus
Tom GreenMarket
OtherTechnology
Project facts
| Canonical name | Water Valley Wind Energy |
|---|---|
| Queue ID | 20INR0247 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Tom Green |
| Technology | Other |
| Capacity | 180.0 MW |
| State | Texas |
| County | Tom Green |
| Point of interconnection | 345 kV 76009 Twin Buttes to 76090 Divide Double Circuit |
| Requested (queue) date | 2019-01-15 |
| Proposed in-service date | — |
| Operational date | 2027-12-15 |
| Withdrawn date | — |
| Developer | Water Valley Wind Energy, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata