Water Valley Wind Energy (20INR0247)

Water Valley Wind Energy is a 180.0 MW other interconnection project in Tom Green, Texas with a current status of operational. It is proposed to connect at 345 kV 76009 Twin Buttes to 76090 Divide Double Circuit .

180.0 MWCapacity
OperationalStatus
Tom GreenMarket
OtherTechnology

Project facts

Canonical nameWater Valley Wind Energy
Queue ID20INR0247
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketTom Green
TechnologyOther
Capacity180.0 MW
StateTexas
CountyTom Green
Point of interconnection345 kV 76009 Twin Buttes to 76090 Divide Double Circuit
Requested (queue) date2019-01-15
Proposed in-service date
Operational date2027-12-15
Withdrawn date
DeveloperWater Valley Wind Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata