Waterbury Generation Increase (331)

Waterbury Generation Increase is a 7.5 MW gas interconnection project in New Haven, Connecticut with a current status of operational. It is proposed to connect at CL&P Baldwin 115 kV substation.

7.5 MWCapacity
OperationalStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameWaterbury Generation Increase
Queue ID331
Statusoperational
Source statusC
MarketSWCT
TechnologyGas
Capacity7.5 MW
StateConnecticut
CountyNew Haven
Point of interconnectionCL&P Baldwin 115 kV substation
Requested (queue) date2010-05-13
Proposed in-service date
Operational date2010-10-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata