Waterford 345kV (Z2-112)

Waterford 345kV is a 97.0 MW gas interconnection project in Washington, Ohio with a current status of operational.

97.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameWaterford 345kV
Queue IDZ2-112
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity97.0 MW
StateOhio
CountyWashington
Point of interconnection
Requested (queue) date2014-04-30
Proposed in-service date
Operational date2015-06-01
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.