Waterloo BESS 1 (25INR0447)

Waterloo BESS 1 is a 105.6 MW other interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at Tap 345-kV 7040 Austrop to 7042 Zorn .

105.6 MWCapacity
OperationalStatus
BastropMarket
OtherTechnology

Project facts

Canonical nameWaterloo BESS 1
Queue ID25INR0447
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBastrop
TechnologyOther
Capacity105.6 MW
StateTexas
CountyBastrop
Point of interconnectionTap 345-kV 7040 Austrop to 7042 Zorn
Requested (queue) date2023-05-15
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperWaterloo BESS, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata