Waterloo BESS 1 (25INR0447)

Waterloo BESS 1 is a 120.0 MW other interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at Tap 345-kV 7040 Austrop to 7042 Zorn .

120.0 MWCapacity
OperationalStatus
BastropMarket
OtherTechnology

Project facts

Canonical nameWaterloo BESS 1
Queue ID25INR0447
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBastrop
TechnologyOther
Capacity120.0 MW
StateTexas
CountyBastrop
Point of interconnectionTap 345-kV 7040 Austrop to 7042 Zorn
Requested (queue) date2023-05-15
Proposed in-service date—
Operational date2027-12-01
Withdrawn date—
DeveloperWaterloo BESS, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30capacity_mw105.64120high
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata