Waterside Power - 180 MW (104)

Waterside Power - 180 MW is a 203.9 MW gas interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at Waterside 115 kV.

203.9 MWCapacity
WithdrawnStatus
NORMarket
GasTechnology

Project facts

Canonical nameWaterside Power - 180 MW
Queue ID104
Statuswithdrawn
Source statusW
MarketNOR
TechnologyGas
Capacity203.9 MW
StateConnecticut
CountyFairfield
Point of interconnectionWaterside 115 kV
Requested (queue) date2003-03-06
Proposed in-service date2011-12-31
Operational date
Withdrawn date2010-07-12
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.