Wattsville 12 kV (AF2-060)

Wattsville 12 kV is a 9.0 MW battery interconnection project in Accomack, Virginia with a current status of suspended.

9.0 MWCapacity
SuspendedStatus
—Market
BatteryTechnology

Project facts

Canonical nameWattsville 12 kV
Queue IDAF2-060
Statussuspended
Source statusSuspended
Market—
TechnologyBattery
Capacity9.0 MW
StateVirginia
CountyAccomack
Point of interconnection—
Requested (queue) date2020-01-25
Proposed in-service date2026-04-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—suspendedhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata