Wattsville 69 kV II (AG1-150)

Wattsville 69 kV II is a 40.0 MW battery interconnection project in Accomack, Virginia with a current status of withdrawn.

40.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameWattsville 69 kV II
Queue IDAG1-150
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity40.0 MW
StateVirginia
CountyAccomack
Point of interconnection
Requested (queue) date2020-09-09
Proposed in-service date2021-12-01
Operational date
Withdrawn date2023-09-12
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.