Waukegan Unit 8 CIR Transfer (AJ1-012)

Waukegan Unit 8 CIR Transfer is a 354.4 MW battery interconnection project in Lake, Illinois with a current status of withdrawn.

354.4 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameWaukegan Unit 8 CIR Transfer
Queue IDAJ1-012
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity354.4 MW
StateIllinois
CountyLake
Point of interconnection—
Requested (queue) date2023-05-24
Proposed in-service date2027-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata