Waverly 138 kV (AF1-308)

Waverly 138 kV is a 60.0 MW solar interconnection project in Pike, Ohio with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWaverly 138 kV
Queue IDAF1-308
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity60.0 MW
StateOhio
CountyPike
Point of interconnection
Requested (queue) date2019-09-30
Proposed in-service date2023-12-31
Operational date
Withdrawn date2020-03-06
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata