WCoMlu3m0b0uWs Solar Energy (31)

WCoMlu3m0b0uWs Solar Energy is a 300.0 MW wind interconnection project in Valencia, New Mexico with a current status of withdrawn. It is proposed to connect at West Mesa-Arroyo 345 kV line east of Belen, NM.

300.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWCoMlu3m0b0uWs Solar Energy
Queue ID31
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity300.0 MW
StateNew Mexico
CountyValencia
Point of interconnectionWest Mesa-Arroyo 345 kV line east of Belen, NM
Requested (queue) date2010-04-28
Proposed in-service date2013-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata