Weirton - Arroyo 25 kV (AH2-038)

Weirton - Arroyo 25 kV is a 10.8 MW solar interconnection project in Hancock, West Virginia with a current status of withdrawn.

10.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWeirton - Arroyo 25 kV
Queue IDAH2-038
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity10.8 MW
StateWest Virginia
CountyHancock
Point of interconnection
Requested (queue) date2021-11-13
Proposed in-service date2024-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.