WELLHEAD POWER LATHROP (36)

WELLHEAD POWER LATHROP is a 99.9 MW gas interconnection project in Stanislaus, California with a current status of withdrawn. It is proposed to connect at 115 kV Tesla - Stockton Cogen Trans. Line..

99.9 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameWELLHEAD POWER LATHROP
Queue ID36
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity99.9 MW
StateCalifornia
CountyStanislaus
Point of interconnection115 kV Tesla - Stockton Cogen Trans. Line.
Requested (queue) date2004-11-01
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata