WELLHEAD POWER NELLA CHP (934)

WELLHEAD POWER NELLA CHP is a 49.0 MW other interconnection project in Merced, California with a current status of withdrawn. It is proposed to connect at Santa Nella-Canal 70kV line.

49.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameWELLHEAD POWER NELLA CHP
Queue ID934
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyOther
Capacity49.0 MW
StateCalifornia
CountyMerced
Point of interconnectionSanta Nella-Canal 70kV line
Requested (queue) date2012-04-02
Proposed in-service date
Operational date
Withdrawn date2013-05-15
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata