Wendell Depot Substation - NG Western MA Area Cluster Study is a 15.0 MW solar interconnection project in Franklin, Massachusetts with a current status of operational. It is proposed to connect at NG Wendell Depot Substation.

15.0 MWCapacity
OperationalStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameWendell Depot Substation - NG Western MA Area Cluster Study
Queue ID826
Statusoperational
Source statusC
MarketWMA
TechnologySolar
Capacity15.0 MW
StateMassachusetts
CountyFranklin
Point of interconnectionNG Wendell Depot Substation
Requested (queue) date2018-12-14
Proposed in-service date
Operational date2021-10-16
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata