West Queue Project 10-037 — Wind in Gilliam, Oregon

West Queue Project 10-037 — Wind in Gilliam, Oregon is a 500.0 MW wind interconnection project in Gilliam, Oregon with a current status of suspended. It is proposed to connect at Proposed Cedar Spring Substation @ 500 kV.

500.0 MWCapacity
SuspendedStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 10-037 — Wind in Gilliam, Oregon
Queue ID10-037
Statussuspended
Source statussuspended
MarketWest
TechnologyWind
Capacity500.0 MW
StateOregon
CountyGilliam
Point of interconnectionProposed Cedar Spring Substation @ 500 kV
Requested (queue) date2010-08-01
Proposed in-service date2015-01-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerPortland General Electric

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata