West Queue Project 1005 — Wind in Summit, Utah

West Queue Project 1005 — Wind in Summit, Utah is a 50.0 MW wind interconnection project in Summit, Utah with a current status of withdrawn. It is proposed to connect at Evanston-Anschutz line.

50.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 1005 — Wind in Summit, Utah
Queue ID1005
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity50.0 MW
StateUtah
CountySummit
Point of interconnectionEvanston-Anschutz line
Requested (queue) date2018-02-15
Proposed in-service date2020-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata