West Queue Project 1035 — Solar+Battery in Utah, Utah

West Queue Project 1035 — Solar+Battery in Utah, Utah is a 100.0 MW solar+battery interconnection project in Utah, Utah with a current status of withdrawn. It is proposed to connect at Camp Williams - Mona transmission line.

100.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 1035 — Solar+Battery in Utah, Utah
Queue ID1035
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity100.0 MW
StateUtah
CountyUtah
Point of interconnectionCamp Williams - Mona transmission line
Requested (queue) date2018-06-08
Proposed in-service date2021-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.