West Queue Project 1159 — Geothermal in Beaver, Utah

West Queue Project 1159 — Geothermal in Beaver, Utah is a 31.1 MW geothermal interconnection project in Beaver, Utah with a current status of withdrawn. It is proposed to connect at South Milford substation.

31.1 MWCapacity
WithdrawnStatus
WestMarket
GeothermalTechnology

Project facts

Canonical nameWest Queue Project 1159 — Geothermal in Beaver, Utah
Queue ID1159
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGeothermal
Capacity31.1 MW
StateUtah
CountyBeaver
Point of interconnectionSouth Milford substation
Requested (queue) date2019-09-09
Proposed in-service date2020-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.