West Queue Project 1161 — Solar+Battery in Crook, Oregon
West Queue Project 1161 — Solar+Battery in Crook, Oregon is a 40.0 MW solar+battery interconnection project in Crook, Oregon with a current status of withdrawn. It is proposed to connect at Ponderosa substation or Houston Lake-Ponderosa transmission line.
Project facts
| Canonical name | West Queue Project 1161 — Solar+Battery in Crook, Oregon |
|---|---|
| Queue ID | 1161 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 40.0 MW |
| State | Oregon |
| County | Crook |
| Point of interconnection | Ponderosa substation or Houston Lake-Ponderosa transmission line |
| Requested (queue) date | 2019-09-19 |
| Proposed in-service date | 2022-05-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata