West Queue Project 1214 — Solar+Battery in Crook, Oregon

West Queue Project 1214 — Solar+Battery in Crook, Oregon is a 40.0 MW solar+battery interconnection project in Crook, Oregon with a current status of withdrawn. It is proposed to connect at Ponderosa substation or Houston Lake-Ponderosa transmission line.

40.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 1214 — Solar+Battery in Crook, Oregon
Queue ID1214
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity40.0 MW
StateOregon
CountyCrook
Point of interconnectionPonderosa substation or Houston Lake-Ponderosa transmission line
Requested (queue) date2020-04-13
Proposed in-service date2024-05-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata