West Queue Project 13 — Battery in Sacramento, California
West Queue Project 13 — Battery in Sacramento, California is a 200.0 MW battery interconnection project in Sacramento, California with a current status of withdrawn. It is proposed to connect at Q4 new switching station near Elverta 230kV Substation.
Project facts
| Canonical name | West Queue Project 13 — Battery in Sacramento, California |
|---|---|
| Queue ID | 13 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | California |
| County | Sacramento |
| Point of interconnection | Q4 new switching station near Elverta 230kV Substation |
| Requested (queue) date | 2021-09-24 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Sacramento Municipal Utility District |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata