West Queue Project 18-05021 — Solar in Weld, Colorado

West Queue Project 18-05021 — Solar in Weld, Colorado is a 150.0 MW solar interconnection project in Weld, Colorado with a current status of withdrawn. It is proposed to connect at Rawhide-Ault 230kV.

150.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 18-05021 — Solar in Weld, Colorado
Queue ID18-05021
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity150.0 MW
StateColorado
CountyWeld
Point of interconnectionRawhide-Ault 230kV
Requested (queue) date2018-05-02
Proposed in-service date2021-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPlatte River Power Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata