West Queue Project 18-10101 — Solar+Battery in Weld, Colorado is a 120.0 MW solar+battery interconnection project in Weld, Colorado with a current status of withdrawn. It is proposed to connect at Rawhide-Ault 230kV.

120.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 18-10101 — Solar+Battery in Weld, Colorado
Queue ID18-10101
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity120.0 MW
StateColorado
CountyWeld
Point of interconnectionRawhide-Ault 230kV
Requested (queue) date2018-10-10
Proposed in-service date2021-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPlatte River Power Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.