West Queue Project 2 — Solar in Sacramento, California

West Queue Project 2 — Solar in Sacramento, California is a 400.0 MW solar interconnection project in Sacramento, California with a current status of withdrawn. It is proposed to connect at Rancho Seco 230kV Substation.

400.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 2 — Solar in Sacramento, California
Queue ID2
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity400.0 MW
StateCalifornia
CountySacramento
Point of interconnectionRancho Seco 230kV Substation
Requested (queue) date2019-10-01
Proposed in-service date2023-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSacramento Municipal Utility District

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata