West Queue Project 2023-MP1 — Solar+Battery in Yavapai, Arizona

West Queue Project 2023-MP1 — Solar+Battery in Yavapai, Arizona is a 500.0 MW solar+battery interconnection project in Yavapai, Arizona with a current status of active. It is proposed to connect at Mead-Perkins 500kV.

500.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 2023-MP1 — Solar+Battery in Yavapai, Arizona
Queue ID2023-MP1
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity500.0 MW
StateArizona
CountyYavapai
Point of interconnectionMead-Perkins 500kV
Requested (queue) date2023-02-03
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata