West Queue Project 2024-MP1 — Battery in Mohave, Arizona
West Queue Project 2024-MP1 — Battery in Mohave, Arizona is a 500.0 MW battery interconnection project in Mohave, Arizona with a current status of active. It is proposed to connect at Mead 500kV Substation.
500.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology
Project facts
| Canonical name | West Queue Project 2024-MP1 — Battery in Mohave, Arizona |
|---|---|
| Queue ID | 2024-MP1 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Battery |
| Capacity | 500.0 MW |
| State | Arizona |
| County | Mohave |
| Point of interconnection | Mead 500kV Substation |
| Requested (queue) date | 2024-01-05 |
| Proposed in-service date | 2028-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata