West Queue Project 2024-MP2 — Battery in Mohave, Arizona

West Queue Project 2024-MP2 — Battery in Mohave, Arizona is a 500.0 MW battery interconnection project in Mohave, Arizona with a current status of active. It is proposed to connect at Mead 500kV Substation.

500.0 MWCapacity
ActiveStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project 2024-MP2 — Battery in Mohave, Arizona
Queue ID2024-MP2
Statusactive
Source statusactive
MarketWest
TechnologyBattery
Capacity500.0 MW
StateArizona
CountyMohave
Point of interconnectionMead 500kV Substation
Requested (queue) date2024-01-05
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.