West Queue Project 22-117 — Battery in Clackamas, Oregon

West Queue Project 22-117 — Battery in Clackamas, Oregon is a 400.0 MW battery interconnection project in Clackamas, Oregon with a current status of withdrawn. It is proposed to connect at Carver Substation.

400.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project 22-117 — Battery in Clackamas, Oregon
Queue ID22-117
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyBattery
Capacity400.0 MW
StateOregon
CountyClackamas
Point of interconnectionCarver Substation
Requested (queue) date2022-12-09
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPortland General Electric

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.