West Queue Project 22 — Gas in Snohomish, Washington

West Queue Project 22 — Gas in Snohomish, Washington is a 302.0 MW gas interconnection project in Snohomish, Washington with a current status of withdrawn. It is proposed to connect at Beverly Park Substation.

302.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project 22 — Gas in Snohomish, Washington
Queue ID22
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity302.0 MW
StateWashington
CountySnohomish
Point of interconnectionBeverly Park Substation
Requested (queue) date2010-03-16
Proposed in-service date2012-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata