West Queue Project 223 — Gas in Salt Lake, Utah

West Queue Project 223 — Gas in Salt Lake, Utah is a 300.0 MW gas interconnection project in Salt Lake, Utah with a current status of withdrawn. It is proposed to connect at Terminal substation.

300.0 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical nameWest Queue Project 223 — Gas in Salt Lake, Utah
Queue ID223
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity300.0 MW
StateUtah
CountySalt Lake
Point of interconnectionTerminal substation
Requested (queue) date2008-05-20
Proposed in-service date2011-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata