West Queue Project 23-225 — Wind+Battery in Columbia, Oregon is a 400.0 MW wind+battery interconnection project in Columbia, Oregon with a current status of withdrawn. It is proposed to connect at Trojan to Harborton 230kV line.

400.0 MWCapacity
WithdrawnStatus
WestMarket
Wind+BatteryTechnology

Project facts

Canonical nameWest Queue Project 23-225 — Wind+Battery in Columbia, Oregon
Queue ID23-225
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind+Battery
Capacity400.0 MW
StateOregon
CountyColumbia
Point of interconnectionTrojan to Harborton 230kV line
Requested (queue) date2023-03-03
Proposed in-service date2028-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPortland General Electric

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata