West Queue Project 23-237 — Solar in Yamhill, Oregon

West Queue Project 23-237 — Solar in Yamhill, Oregon is a 105.0 MW solar interconnection project in Yamhill, Oregon with a current status of withdrawn. It is proposed to connect at Springbrook Substation.

105.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 23-237 — Solar in Yamhill, Oregon
Queue ID23-237
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity105.0 MW
StateOregon
CountyYamhill
Point of interconnectionSpringbrook Substation
Requested (queue) date2023-08-25
Proposed in-service date2026-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerPortland General Electric

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.