West Queue Project 24-247 — Battery in Columbia, Oregon

West Queue Project 24-247 — Battery in Columbia, Oregon is a 200.0 MW battery interconnection project in Columbia, Oregon with a current status of withdrawn. It is proposed to connect at Kaster Substation 115 kV.

200.0 MWCapacity
WithdrawnStatus
WestMarket
BatteryTechnology

Project facts

Canonical nameWest Queue Project 24-247 — Battery in Columbia, Oregon
Queue ID24-247
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyBattery
Capacity200.0 MW
StateOregon
CountyColumbia
Point of interconnectionKaster Substation 115 kV
Requested (queue) date2024-05-20
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPortland General Electric

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata